The unlined spillway tunnels at Virdnejavri dam. | Article | Marheim, A. Hverven, V. Johansen, P.M. Lysne, D.K. Jenssen, L. | International Congress on Large Dams, 18. Durban 1994. Transactions, Vol. 4, pp. 267-280. | 1994 |
Instrumentation and monitoring of the Virdnejavri arch dam - Alta. | Article | Tronstad, K. Johansen, P.M. Engene, B. Myrset, O. | Geotechnical instrumentation in practice. Proceedings of a conference. Nottingham 1989. Pp. 439-446.
NGI rapport 530000-08 | 1990 |
Vederlag for Alta-dammen. MÃ¥leresultater fra 1. gangs oppfylling. : Foundation of the Alta arch dam. Geotechnical measurement results from the first impounding of the reservoir. | Article | Johansen, P.M. | Fjellsprengningsteknikk - bergmekanikk - geoteknikk. Oslo 1987, pp. 34.1-34.9. Trondheim, Tapir. | 1987 |
Geodynamiske målinger for kontroll av fjellfundamenter ved 3 store damprosjekter. : Geodynamic methods to control and assess rock foundations at three major dam projects. | Article | By, Tore Lasse | Fjellsprengningsteknikk - bergmekanikk - geoteknikk. Oslo 1985, pp. 36.1-36.15. Trondheim, Tapir. | 1985 |