| Tittel: | THE 7800 OMEGA/VLF NAVIGATION SYSTEM : PILOT GUIDE and INSTALLATION/CHECKOUT AND LINE MAINTENANCE MANUAL and 7800 Omega/VLF DATA PACKAGE and TRACOR 1979 Annual Report + Business and commercial Aviation + Interconnect Diagram |
| Materialtype: | Manual/Sivil |
| Signatur: | 20-A-2 |
| Utgitt: | Austin, Texas : Tracor, Inc., 1979 |
| Klassenummer: | Perm |
| Emneord: | Line maintenance manual / Navigation / Omega System / Tracor / VLF system |
| Materialbetegnelse: | Perm |
| Note: | Publishing date for "Pilot Guide" is April 10, 1980. For "Line Maintenance Manual" publishing date is September 1, 1979, Last Revision, Rev. No. 1 March 7, 1980. Publishing date for "Data Package" is not available. For "Business and commercial Aviation" publishing date is February 1980 |
| Innhold: | TABLE OF CONTENTS: PILOT GUIDE: INTRODUCTION PREDEPARTURE NORMAL OPERATION EMERGENCY OPERATION APPENDIX
INNSTALLATION/CHCEKOUT AND LINE MAINTENANCE MANUAL: INTRODUCTION PART I - TECHNICAL INFORMATION AND INSTALLATION DRAWINGS 1. RECEIPT OF NEW EQUIPMENT 1.A Physical Inspection 1.B Electrical Inspection 1.C Leading Particulars 2. PRE-INSTALLATION PLANNING 2.A Model 7800 ONS Configuration Determination 2.B Locating Physical Mounting Area for Omega Antenna 2.C Locating Physical Mounting Area for Omega CDU 2.D Locating Physical Mounting Area for Omega RPU 2.E Overall Cabling Configuration Planning 3. INITIAL INSTALLATION DOCUMENTATION 3.A Aircraft Preparation Considerations 3.B Aircraft Interface Wiring 3.C ONS Equipment Installation PART II - POST-INSTALLATION FUNCTIONAL TEST PROCEDURE FOR TRACOR ONS MODEL 7800 INTRODUCTION 1. OTHER AIRCRAFT SYSTEMS - OPERATIONAL REQUIREMENTS 1.A ONS Primary Electrical Power 1.B ONS Primary Directional Gyro Compass System 1.C ONS Primary Air Data Computer/Speed System 2. INITIAL OMEGA SYSTEM TURN-ON OPERATIONS 2.A Power On and Display Lamp Test 3. ONS HEADING INPUT FUNCTION OPERATIONS 3.A Automatic Aircraft Heading Input Control to ONS 4. ONS SPEED INPUT FUNCTION OPERATIONS 4.A Automatic Aircraft Speed Input Control to ONS 4.B ONS Programmed Constant Speed (Auto-constant) 5. ONS INITIALIZATION OPERATION TEST 5.A Omega Format Synchronization Mode 5.B Initialization and DR Mode 5.C Waypoint and Flight Plan Operation Test 6. NAVIGATION FUNCTION OPERATIONS TEST (DR-MODE) 6.A Initial Tract Segment Test Procedure 6.B Navigation Data/Display Functional Test 6.C ONS Reset to Normal after DR Mode Test 7. ONS OMEGA/VLF MODE OPERATION TEST 7.A Preliminary Steps to Omega/VLF Mode Operation Test 7.B Omega Mode Test Observations 7.C Omega Lane Resolution Function 7.D Power Interrupt Recover Test 8. OPTIONS TEST 8.A HSI/AUTOPILOT Output Test 8.B Dual ONS Installation PART III - LINE MAINTENANCEFOR TRACOR ONS MODEL 7800 INTRODUCTION 1. DESCRIPTION AND OPERATION 1.A Unit Description 1.B Operation 2. OMEGA NAVIGATION SYSTEM INTERFACES 3. STATUS/WARNING INDICATORS AND FAULT CODES 3.A Status/Warning Indicators 3.B Microprocessor BITE Status Indicator 3.C Fault Codes 4. OPERATIONAL VERIFICATION 4.A Turn-On 4.B Initialization (Predeparture) 4.C Stations and Signals 4.D Power Interrupt > 7 Seconds, < 7 Minutes 4.E Options Test 4.E Checkout 5. TROUBLESHOOTING 6. MAINTENANCE INSTRUCTIONS 6.A Servicing 6.B Removal/Installation 6.C Operational Test 6.D Cleaning 6.E Approved Repairs APPENDIX A - FINDING AN ACCEPTABLE A/C STATION FOR ONS LOOP ANTENNA APPENDIX B - ONS 7800 AIRCRAFT INTERFACE FUNCTIONAL DIAGRAMS AND WIRING LIST FOR FAULT ANALYSIS A/C Interface Diagram ONS 7800 Wire List APPENDIX C - CDU Function and Dispaly Table Remote Dispaly Summary Table Test Code Table
TRACOR AEROSPACE GROUP 7800 Omega/VLF DATA PACKAGE: 1.0 INTRODUCTION 2.0 SYSTEM DESCRIPTION 3.0 DESIGN FEATURES 4.0 EQUIPMENT PART NUMBERS 5.0 PRODUCT SUPPORT 6.0 WARRANTY AND REPAIR 7.0 TRAINING 8.0 TECHNICAL DOCUMENTATIONS ENCLOSURES I. BROCHURE II. TRACOR ANNAUAL REPORT III. BUSINESS & COMMERCIAL AVIATION ARTICLE OMEGA MODEL 7800 INTERCONNECT DIAGRAM (TYPICAL - WITH OPTIONS) |
| Eier: | Norsk Luftfartsmuseum |
| |
|