Tittel: | MARTIN-BAKER MARK 5 SERIES EJECTION SEAT : part one: Instruction and Servicing Manual for Mk. A5 |
Materialtype: | Manual/Sivil |
Signatur: | 23-C-1c |
Utgitt: | Middlesex, England : MARTIN-BAKER AIRCRAFT COMPANY LTD..- Second Edition |
Omfang: | 85 s. - ill..- Second Edition |
Serie: | Publication No. ; M-B 18 |
Emneord: | Drouge Gun / Ejection Seat / Parachute |
Materialbetegnelse: | Technical Handbook |
Materialbetegnelse: | Mappe/Perm |
Note: | Amendment Record Sheet Latest Entry: Amendment No. 6, Date: 22.4.59 There is a Norwegian Summary Prior to the Sections |
Innhold: | TABLE OF CONTENTS: SECTION ONE: EJECTION SEAT DESCRIPTION GENERAL SEAT STRUKTURE Framework Seatpan and Raising Mechanism EJECTION GUN AND GUIDE RAIL DROGUE GUN THE DUPLEX DROGUE TIME DELAY MECHANISM G Switch Barostatic Control Escapement Mechanism HARNESS AND LEG LINE RELEASE MECHANISM Top Harness Lock Leg Line Lock Manual Over-ride Lever AUTOMATIC LEG RESTRAINT HORSESHOE PARACHUTE PACK HARNESS PRE-FLIGHT ACTION AND EJECTION SEQUENCE ACTION BEFORE FLIGHT ACTION AFTER FLIGHT EJECTION SEQUENCE Ejection Drill Sequence of Operations, Figure 18 MANUEL RELEASE Manual Separtio from Seat Free Bale-out from Aircraft Ditching or Crash Landing SERVICING SAFETY PRECAUTIONS PERIODIC SERVICING INTERVALS OF ONE WEEK INTERVALS OF ONE MONTH Checking Barostat Assemblies INTERVALS OF TWO MONTHS Removal of Parachute Pack Replacement of Parachute Pack INTERVALS OF THREE MONTHS Removing Primary Cartridge Removing Drogue Gun and Cartridge Removal of Parachute Pack Removal of Seat from Aircraft Removal of Drogues Removal and inspection of ejection gun Secondary Cartridges (Removal and Replacement) Replacement of Ejection Gun Time Delay Mechanism Checking the 'G' Switch Manual Over-ride Function Checking Alternative Firing Handle Seatpan alignment Replacing Seat in Aircraft Replacing Parachute and Harness Loading Drogue Gun Cartridge Loading Primary Cartridge CARTRIDGE LIFE
SECTION TWO: PARACHUTE PACK DESCRIPTION FOLDING THE CANOPY SECURING THE MAIN LIFT WEBS STOWING THE RIGGING LINES STOWING THE CANOPY CLOSING THE SIDE AND TOP FLAPS FOLDING AND STOWING AUXILIARY PARACHUTE COMPLETING THE PACKING 'D' RING ASSEMBLY
SECTION THREE: DUPLEX DROGUE REMOVAL AND INSPECTION Removal of Drogues Inspection PACKING Packing the Large Drogue Packing the Small Drogue Stowing Face Blind |
Eier: | Norsk Luftfartsmuseum |
|
|