Søk i Norsk luftfartsmuseum
  • Portal
  • Søk
    v
  • Treffliste
  • Mine lån
  • Utlån
  • Innlevering
  • Gi vurdering
  • Reserver
  • Fjernlån
  • Marcdata
  • RIS
Tittel:MARTIN-BAKER MARK 5 SERIES EJECTION SEAT : part one: Instruction and Servicing Manual for Mk. A5
Materialtype:Manual/Sivil
Signatur:23-C-1c
Utgitt:Middlesex, England : MARTIN-BAKER AIRCRAFT COMPANY LTD..- Second Edition
Omfang:85 s. - ill..- Second Edition
Serie:Publication No. ; M-B 18
Emneord:Drouge Gun / Ejection Seat / Parachute
Materialbetegnelse:Technical Handbook
Materialbetegnelse:Mappe/Perm
Note:Amendment Record Sheet Latest Entry:
Amendment No. 6, Date: 22.4.59
There is a Norwegian Summary Prior to the Sections
Innhold:TABLE OF CONTENTS:
SECTION ONE: EJECTION SEAT
DESCRIPTION
GENERAL
SEAT STRUKTURE
Framework
Seatpan and Raising Mechanism
EJECTION GUN AND GUIDE RAIL
DROGUE GUN
THE DUPLEX DROGUE
TIME DELAY MECHANISM
G Switch
Barostatic Control
Escapement Mechanism
HARNESS AND LEG LINE RELEASE MECHANISM
Top Harness Lock
Leg Line Lock
Manual Over-ride Lever
AUTOMATIC LEG RESTRAINT
HORSESHOE PARACHUTE PACK
HARNESS
PRE-FLIGHT ACTION AND EJECTION SEQUENCE
ACTION BEFORE FLIGHT
ACTION AFTER FLIGHT
EJECTION SEQUENCE
Ejection Drill
Sequence of Operations, Figure 18
MANUEL RELEASE
Manual Separtio from Seat
Free Bale-out from Aircraft
Ditching or Crash Landing
SERVICING
SAFETY PRECAUTIONS
PERIODIC SERVICING
INTERVALS OF ONE WEEK
INTERVALS OF ONE MONTH
Checking Barostat Assemblies
INTERVALS OF TWO MONTHS
Removal of Parachute Pack
Replacement of Parachute Pack
INTERVALS OF THREE MONTHS
Removing Primary Cartridge
Removing Drogue Gun and Cartridge
Removal of Parachute Pack
Removal of Seat from Aircraft
Removal of Drogues
Removal and inspection of ejection gun
Secondary Cartridges (Removal and Replacement)
Replacement of Ejection Gun
Time Delay Mechanism
Checking the 'G' Switch
Manual Over-ride Function
Checking Alternative Firing Handle
Seatpan alignment
Replacing Seat in Aircraft
Replacing Parachute and Harness
Loading Drogue Gun Cartridge
Loading Primary Cartridge
CARTRIDGE LIFE

SECTION TWO: PARACHUTE PACK
DESCRIPTION
FOLDING THE CANOPY
SECURING THE MAIN LIFT WEBS
STOWING THE RIGGING LINES
STOWING THE CANOPY
CLOSING THE SIDE AND TOP FLAPS
FOLDING AND STOWING AUXILIARY PARACHUTE
COMPLETING THE PACKING
'D' RING ASSEMBLY

SECTION THREE: DUPLEX DROGUE
REMOVAL AND INSPECTION
Removal of Drogues
Inspection
PACKING
Packing the Large Drogue
Packing the Small Drogue
Stowing Face Blind
Eier:Norsk Luftfartsmuseum


EksemplarStatusNoteEierPlasseringBindHylleFrist
1.exIkke til utlånNorsk LuftfartsmuseumNorsk Luftfartsmuseum
Vurdering:
Ikke til utlån