Tittel:Carbon capture and storage at Kårstø
Ansvar:editor: Pål Tore Svendsen ; authors: Olav Falk-Pedersen ... [et al.] ; [translated by Hugh M. Allen]
Forfatter:Svendsen, Pål Tore / Falk-Pedersen, Olav / overs.: Allen, Hugh M.
Materialtype:NVEs utgivelser
Signatur:556(05)
Utgitt:Oslo : NVE, 2007
Omfang:82 s. - ill. (noen kol.)
ISBN/ISSN:978-82-410-0635-7 / 1502-3540
Klassenummer:502.3:[621.311.2:661.97(482.2) / 621.438:661.97.002(482.2)
Serie:NVE Report ; 2007:2
Emneord:Gasskraftverk / Gassteknologi / Karbondioksid / Klimagasser / Utslipp
Geografiske emneord:Tysvær kommune
Note:Originalens tittel: CO2-håndtering på Kårstø : fangst, transport, lagring
Forfattere: Olav Falk-Pedersen, Mari Hegg Gundersen, Asle Selfors, Pål Tore
Svendsen
Dokumentet er en engelsk oversettelse av NVE Rapport 2006:13
Har bibliografi
Innhold:Sammendrag: The report describes technical, economic and scheduling aspects of a
CO2 capture and storage facility at Kårstø. Such a plant located at Kårstø would be
around ten times as large as the biggest equivalent plant currently in existence. NVE
regards it as likely that a full-scale plant would provide technical performance as
described. The costs of the planning phase are estimated to be approximately NOK
330 million, investment in the capture plant around NOK 3.46 billion, and the costs of
transportation and storage are estimated at NOK 1.56 billion. Based on the
assumption of 8000 hours of operation, annual operating costs are estimated to be
about NOK 370 million, leading to a cost of CO2 abatement of about NOK 700 per
tonne of CO2 captured in the course of 8000 hours of operation. An ambitious but
responsible schedule would see operation under way at the turn of the year
2011/2012. The project is exposed to a significant degree of risk in terms of
performance, costs and time. The utilisation factor for the gas-fired power plant,
energy costs, the fact that the plant would probably be the first of its size in the
world, and commercial interfaces with the parties involved at Kårstø are all significant
uncertainties.
Eier:NVE
Eksemplar:2. (2 tilgjengelige)


EksemplarStatusNoteEierPlasseringBindHylleFrist
1.exTilgjengeligNVENVE-biblioteket556(05)
2.exTilgjengeligNVENVE-biblioteket556(05)
Vurdering:
URL:https://publikasjoner.nve.no/report/2007/report2007_02.pdf