Tittel: | Cost base for hydropower plants : with a generating capacity of more than 10 000 kW : price level 1 January 2010 |
Ansvar: | editor: Jan Slapgård ; authors: SWECO Norge AS |
Forfatter: | red.: Slapgård, Jan |
Materialtype: | NVEs utgivelser |
Signatur: | 556(05) |
Utgitt: | Oslo : NVE, 2012 |
Omfang: | 176 s. - ill. |
ISBN/ISSN: | 1501-0678 |
Klassenummer: | 657.471:621.22(481) |
Serie: | NVE Veileder ; 2012:3 |
Emneord: | Kraftkostnader / Kraftproduksjon / Teknisk utstyr / Vannkraftanlegg |
Geografiske emneord: | Norge |
Note: | Foreligger kun i elektronisk format Engelsk versjon av NVE Håndbok 2012:2 |
Innhold: | Sammendrag: This manual has been prepared as a tool for calculation of average foreseeable contractor costs (civil works) and supplier costs (mechanical and electrical equipment) for large hydroelectric power plants with an early phase generating capacity of more than 10 000 kW. These costs will depend on a number of conditions which may vary from plant to plant, and this requires that the user to have a sound technical knowledge. This applies in particular to the civil works associated with the hydropower plant. The manual is a supplement to our cost base for smaller hydropower projects (Manual No. 2/2010) |
Eier: | NVE |